Eleven stages before a single gram of powder

Powder fails at the interface, not the surface. Thimark's line runs a full 11-stage pre-treatment sequence so the conversion coat underneath is doing the work.

Sample copyThis service is not yet described in Thimark’s corporate profile. Dip sequence, rack envelope, film thickness and stock colours on this page are plausible defaults. Replace them with the line’s real specification before publishing.

0111-Dip Pre-Treatment

The sequence a part travels

Degrease, derust, condition, phosphate, passivate, rinse to demineralised water, then dry, before the part is allowed anywhere near the booth.

  1. 01

    Degreasing

    Alkaline bath lifts oils, drawing compound and shop soil.

  2. 02

    Rinse

    Fresh-water rinse to arrest carry-over between chemistries.

  3. 03

    Derusting

    Acid pickle removes mill scale and flash rust.

  4. 04

    Rinse

    Second rinse stage; bath conductivity monitored.

  5. 05

    Surface Conditioning

    Refines crystal size ahead of phosphating.

  6. 06

    Zinc Phosphating

    Builds the conversion coat that anchors the powder.

  7. 07

    Rinse

    Removes unreacted phosphate salts.

  8. 08

    Passivation

    Seals the phosphate layer, raising corrosion resistance.

  9. 09

    DM Water Rinse

    Demineralised final rinse, no dissolved solids left behind.

  10. 10

    Dry-Off Oven

    Moisture driven off before the parts reach the booth.

  11. 11

    Powder Application & Cure

    Electrostatic spray, then cured to the powder's schedule.

Why eleven

Each rinse stage exists to stop the previous chemistry contaminating the next bath. Skip them and the phosphate layer goes patchy, which is where filiform corrosion starts.

Film thickness

60–100 µm typical, verified by gauge. Checked with a gauge on every batch and recorded against the job.

Cure

Electrostatic application, then cured to the powder manufacturer's own schedule, not to a house average.

02Materials & Envelope

What the line takes

Maximum part envelope
2,400 mm × 900 mm × 1,800 mm
Substrates
Mild steel (CR / HR)Galvanised steelAluminiumStainless steel
Finishes
GlossMattSatinTexturedStructured
Batch
Rack and batch job work, single parts to production volumes
Racked components entering the powder coating booth

Colour: Full RAL Classic range; standard stock in RAL 9005, 9016, 7016, 3002 and 5010

  • RAL 9005Jet Black
  • RAL 9016Traffic White
  • RAL 7016Anthracite Grey
  • RAL 3002Carmine Red
  • RAL 5010Gentian Blue
  • RAL 6005Moss Green
  • RAL 1023Traffic Yellow
  • RAL 7035Light Grey

03Job Work Enquiry

Size your batch

Tell the line what's coming and it will tell you how much surface area that is, how many rack batches it fills, and roughly how long it occupies the oven.

The batch

01The batch

Leave blank if you'd like a recommendation.

Part envelope

02Part envelope

Optional for flat parts.

Your details

03Your details

Job work accepted from single parts to production batches.